Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

NAHLN/USA Herds Setup Guides

Please Note

This is an example. Each configuration should be modified to match your workflow and requirements.

Two Part Process

Setting up the NAHLN / USA Herds interface has 2 steps: 1st is the Message Definition in the API and then the Test Definition on the test setup screen.

Step 1: How do I set up the API?

Enable the NAHLN Interface section

    • This enables the interface and opens the NAHLN Tab.

    • The Certificate Folder - Is a folder on the server where the API will save any Certificates or other setup files needed in the message definition.

Create a Message Definition

Step 2: How do I set up the Test Definition?

Test Setup Screen - Add New Message Profile

  • Choose the Message Profile that was setup in the API
  • Select when the message should be added to the Queue for processing:
    • Accession finalizes
    • Test Finalizes
    • Manually sent


NAHLN Disease Program Setup

These are some examples of how to setup a message profile for the following diseases.

How do I monitor the Sending and Logging of Messages?

Result Entry Area - For tests that have message defined will automatically have a section added the result area where you can see the status of the out going messages.

API - Logging



VetView Wiki

Most recent releases of VetView:  Version 4.2.5 Hotfix (Released 10/31/2024)

  • No labels